|
Trail Ridge Road closed on Oct. 21st and will re-open sometime in mid-May of 2010.
trailridge closure
National
Park Service Officials Close Trail Ridge Road to Through Travel For the
2009 Season
Date:
October 21, 2009
Contact:
Kyle Patterson, RMNP Spokesperson @ 970-586-1363
Today,
Wednesday, October 21, 2009, Trail Ridge Road officially
closed for the season to through travel. Old Fall River Road officially
closed for the season on October 8, 2009. Since Sunday, October 4,
Trail Ridge Road has been closed due to consistent winter conditions of
drifting snow, high winds and below freezing temperatures above 10,000
feet.
Trail
Ridge Road, one of the most impressive alpine highways in
the United States, is the highest continuous road in America and
reaches an elevation of 12,183 feet. The road connects the
park’s
gateway communities of Estes Park on the east and Grand Lake on the
west. The road is currently closed at Colorado River Trailhead on the
west side and Many Parks Curve on the east side.
Old
Fall River Road is an unpaved road that travels from Endovalley
picnic area to above treeline at Fall River Pass, following the steep
slope of Mount Chapin. Due to the road’s narrow nature, the
scenic
9.4-mile route leading to Trail Ridge Road is one way only. The Old
Fall River Road was built between 1913 and 1920.
According
to Superintendent Vaughn Baker, “After recent snowfall
accumulation at high elevations in the park, with the accompanying wind
and ice, as well as the forecast for periodic storms at high
elevations, we have decided to officially close Trail Ridge Road for
the season. The snow continues to blow and drift at higher elevations,
making snow clearing operations and driving conditions extremely
hazardous. During the winter season, weather permitting, we will keep
Trail Ridge Road open to Many Parks Curve on the east side of the park
and to the Colorado River Trailhead on the west side of the
park.”
Trail
Ridge Road was opened in 1932. The average winter closure date
has been October 23. The previous ten year’s closure dates
are:
November 6, 2008, October 22, 2007, October 23, 2006, November 4, 2005,
October 25, 2004, November 6, 2003, November 1, 2002, October 18, 2001,
November 2, 2000, November 22, 1999.
The central portion of Trail
Ridge Road normally opens the last week in May, weather permitting.
This year Trail Ridge Road opened on May 21, 2009.
|